Skip to Content

Activation Timeframe for NBN Bundle and Standalone

Estimated Reading Time: 4 Minutes

Introduction

As a customer looking to connect to NBN services, it is important to know the service classes and installation timeframes that are available. This article aims to provide a summary of the NBN service classes and its installation time, as well as information on phone activation timeframes and NBN transfers.

 

NBN Service Classes and Installation Timeframes:

When connecting to NBN, you will receive an email that identifies your service class. The table below shows the different service classes, their definitions, and the installation timeframes:

Service Class

Definition

Installation Timeframe (Business days)

Tech visit required?

0

Planned to be serviceable by fibre

Not Yet Serviceable

Not Yet Serviceable

1

Serviceable by fibre, no PCD or NTD in place (FTTP)

5-20

Yes

2

Serviceable by fibre, PCD installed, no NTD in place (FTTP)

5-20

Yes

3

Serviceable by fibre, PCD and NTD in place (FTTP)

2 (BYO modem and No Number Transfer)

 

5 (SpinTel supplied modem or Number Transfer required)

No

4

Planned to be serviceable by Fixed Wireless

Not Yet Serviceable

Not Yet Serviceable

5

Serviceable by Fixed Wireless, no antenna and NTD in place

5-20

Yes

6

Serviceable by Fixed Wireless, antenna and NTD in place

2 (BYO modem and No Number Transfer)

 

5 (SpinTel supplied modem or Number Transfer required)

No

7

Planned to be serviceable by Satellite

SpinTel does not offer Satellite services

SpinTel does not offer Satellite services

8

Serviceable by Satellite, no satellite dish/NTD in place

SpinTel does not offer Satellite services

SpinTel does not offer Satellite services

9

Serviced by Satellite, dish and NTD in place

SpinTel does not offer Satellite services

SpinTel does not offer Satellite services

10

Planned to be serviceable by Copper (FTTN)

Not Yet Serviceable

Not Yet Serviceable

11

Serviceable by Copper, copper lead-in required (FTTN)

5-20

Yes

12

Serviceable by Copper, jumpering is required (FTTN)

5-20

Yes, if no current active service

13

Serviceable by Copper, infrastructure in place (FTTN)

2 (BYO modem and No Number Transfer)

 

5 (SpinTel supplied modem or Number Transfer required)

No

20

Planned to be serviceable by cable (HFC)

Not Yet Serviceable

Not Yet Serviceable

21

Within the HFC footprint, no drop, wall plate or NTD

5-20

Yes

22

Within the HFC footprint, drop in place, no wall plate or NTD

5-20

Yes

23

Within the HFC footprint, drop and wall plate in place, no NTD

5-20

Yes

24

Within HFC footprint, drop, wall plate, and NTD in place

2-5

No

30

Planned to be serviceable by Fibre to the Curb (FTTC)

Not Yet Serviceable

Not Yet Serviceable

31

Within the FTTC footprint, copper lead-in is required, NTD will also be installed by the technician

5-20

Yes

32

Within the FTTC footprint, copper lead-in ins present but not connected to DPU

5-20

Yes

33

Within the FTTC footprint, property is connected to DPU but an NTD is required

5-20

No

34

Within the FTTC footprint, has previously been transferred to NBN and can transfer to a new provider without an installation appointment

2 (BYO modem and No Number Transfer)

 

5 (SpinTel supplied modem or Number Transfer required)

No

Service Class and Definition

The table above provides a summary of the different service classes and their definitions. It is important to note that service classes 0, 4, 7, 8, 9, 10, and 20 are not yet serviceable.

 

Installation Timeframes

The installation timeframes for each service class vary from 2 to 20 business days, depending on the service class and whether a technician visit is required. It is important to note that for FTTP, FW, and HFC, customers can still use the existing copper and porting can take up to 5 days to complete after NBN completion.

 

Phone Activation Timeframe

Type of transfer
Modem Type Porting Required Timeframe
Bundle NBN Transfers (NBN and Phone) SpinTel Supplied Modem No Within 3 days from the submission date
Bundle NBN Transfers (NBN and Phone) BYO Modem No Same day as the submission date
Bundle NBN Transfers (NBN and Phone) Any Modem Yes 5-10 business days from submission
Business Phone Porting Any Modem Yes (Complex Porting) 5-6 weeks for complex cases (i.e., the number is linked with other numbers or has complex services - e.g. ISDN, Line Hunt, etc.)
Standalone NBN Transfers BYO Modem No Same day as the submission date
Standalone NBN Transfers SpinTel Supplied Modem No Within 3 days from the submission date

 

Conclusion

This article has provided customers with important information on NBN service classes and installation timeframes, phone activation timeframes, and NBN transfers. It is important to note that the process date cannot be reversed or changed, and if there is a porting issue, the NBN order may need to be cancelled and resubmitted.

Activation Timeframe for NBN Bundle and Standalone